Assignment Task Part 1- Equipment resources planning and management Based on successful establishment of Disneyland theme park and resorts on a large reclaimed land from sea in Hong Kong, a similar development has been planned in another Asian country (i.e., through dredging based land reclamation from sea). Assume a main role for planning an... Get Start

Subject Code : MME80001
University : Swinburne University of Technology UniLearnO is not sponsored or endorsed by this college or university.
Country : Australia
  • Uploaded By : Andrew
  • Posted on : April 15th, 2024

Assignment Task Question 1 Prepare the schedule in Primavera P6 for constructing the bridge shown below. Assume the project starts on 1 st July 2020 and all seven days in every week is a working day in this proje The work starts with the construction of the foundation (F) for the two piers (i.e. both Pier 1 and 2) simultaneously. D... Get Start

Subject Code : MME80001
University : Swinburne University of Technology UniLearnO is not sponsored or endorsed by this college or university.
  • Uploaded By : Andrew
  • Posted on : April 05th, 2024

Assignment Task: Task 1: Prepare the schedule in Primavera P6 for constructing the bridge shown below. Assume the project starts on 1st June 2020 and all seven days in every week is a working day in this project.  a) The work starts with the construction of the foundation (F) for the two piers (i.e. both  Pier 1 and 2) simult... Get Start

Subject Code : MME80001
University : Swinburne University of Technology UniLearnO is not sponsored or endorsed by this college or university.
Country : Australia
  • Uploaded By : admin
  • Posted on : May 19th, 2019
  • Downloads : 0
Hire A Tutor
loader